Biomass Shredder for 4–6 Tons/Hour Corn Stubble Hay Bale Processing
A customer from Mexico requires a reliable biomass shredder to process hay bales made from corn stubble. The input material is compacted bales of dimensions 1.2x2.1x1.5 meters and weight 500 kg. The desired output size is 6–9 cm, with a required processing capacity of 4–6 tons per hour.Based on these specifications, we recommend the GEP Ecotech GDB115 Double-Shaft Biomass Shredder, which is specifically designed for shredding bulky agricultural waste like hay bales, corn stubble, and other biomass…
Learn MoreBiomass Fuel Pre-Shredding Project in Heilongjiang, China



A biomass cogeneration project in Heilongjiang, China, required the shredding and pre-processing of biomass fuels such as corn stalks, which were in bales and therefore required a high level of shredding equipment. The biomass shredder has been optimized to ensure a continuous supply of raw materials and a 24-hour continuous supply of material, which is particularly satisfactory to the customer. The shredded size of 100mm and the output of 50-60t/h is in line with the target set by the customer.
Learn MoreIntegrated Biomass Shredding and Disposal Project in Northeast China



Pre-shredding of biomass is an important part of a biomass cogeneration project. A cogeneration plant in the northeast chose a large biomass shredding plant from GEP ECOTECH CO., LTD for the shredding of biomass such as corn straw. The plant runs stably and shreds efficiently, with a finished size of about 100mm and an output of 60 tones per hour. The customer said that the whole set of biomass shredding solutions provided by GEP was well designed and practical, which stood out from many competitors and…
Learn MoreBiomass Straw Shredding and Disposal Project in Northeast China



Waste straw and rice husk, forestry waste bark residue, etc. are very good fuels for biomass power plants, and all the GEP's biomass shredder has to do is to pre-shred these straws, and the shredded straws will be more efficient and convenient when burned again. The production site is located in a large agricultural province in the northeast, the size of the shredded product is
Learn MoreGEP ECOTECH North Negros Biopower(NNBP)) 25MW Power Plant Fuel Handling System Kick-Off Meeting
On the morning of November 14, GEP ECOTECH North Negros Biopower(NNBP) 25MW Power plant Fuel Handling System Kick-off Meeting was solemnly held in Zhengzhou GEP conference room. The project team of NNBP 25MW biomass power plant, senior leaders of GEP and the project team attended the meeting.The NNBP 25MW biomass power station project team is part of a well-known international group. The Group is a multinational world top 500 enterprise, engineering design and consulting strength lead the world in energy,…
Learn More