A biomass cogeneration project in Heilongjiang, China, required the shredding and pre-processing of biomass fuels such as corn stalks, which were in bales and therefore required a high level of shredding equipment. The biomass shredder has been optimized to ensure a continuous supply of raw materials and a 24-hour continuous supply of material, which is particularly satisfactory to the customer. The shredded size of 100mm and the output of 50-60t/h is in line with the target set by the customer.

Live Chat Leave Message
  • Capacity

    50-60 Ton/Hour

  • Application

    Shred Crop Stalks to Produce fuel for Power Station

  • Material

    Corn Stalks