Hotline:+86-371-56177311

|

Email:sales@gepecotech.com

|

Bulky Waste Disposal Project in Minhang District, Shanghai

2018-10-25
  • Bulky Waste Disposal Project in Minhang District, Shanghai
  • Bulky Waste Disposal Project in Minhang District, Shanghai
  • Bulky Waste Disposal Project in Minhang District, Shanghai
  • Bulky Waste Disposal Project in Minhang District, Shanghai
  • Bulky Waste Disposal Project in Minhang District, Shanghai

Client: Bulky Waste Disposal Project in Minhang District, Shanghai

Material: Waste sofa, mattresses, furniture, chairs, etc.

The material size after shredding: <300mm

Capacity: 20-40m³/h

Crushing result: Volume reduction; facilitate transportation; the pretreatment of waste incineration power generation.

Customer evaluation: From equipment selection to installation and commissioning, GEP ECOTECH’s professional production line and service are quite satisfying. The configurations of intelligent monitoring system, iron removal system and dust suppression system make the production line smarter and more intellectualized and humanistic. Because of reliable quality, stable running, high yield and low consumption, the output exceeds expectations. It turns out that work with GEP is a right option.

Solutions

Recommended topic

Leave a message

leave your request, we will contact you as soon as possible.

Please click on"Online Service""WhatsApp"contact us at any time.