Summer

Name: Summer

Job Title:  Installation Engineer

Motto: Professional explanation of industrial waste shredding disposal plan

182021.05
Accelerating the recycling of household waste, this is what GEP is doing
SummerSummer

Accelerating the recycling of household waste, this is what GEP is doing

On May 13, the National Development and Reform Commission and the Ministry of Housing and Urban-Rural Development issued the "14th Five-Year Plan for the Development of Urban Domestic Waste Classification and Treatment Facilities". According to the plan, by the end of 2025, the national urban domestic waste resource utilization rate will reach about 60%; the national domestic waste sorting and…

Learn More348
142021.05
SummerSummer

A quick overview of GEP bulky waste disposal projects

In 2010, the Ministry of Housing and Construction officially released the first regulation specifically for bulky waste disposal in China, "Technical Requirements for Bulky Waste Collection and Utilization" (GB/T25175-2010). In the context of waste classification, from 2017, Xiamen, Shenzhen, Beijing, Shanghai and other cities have released their bulky waste management methods, and group…

Learn More225
272021.04
SummerSummer

Realize carbon emission peak, carbon neutrality, Gep is taking action

On April 22, World Earth Day, President Xi Jinping was invited to attend the Leaders' Climate Summit by video and delivered an important speech entitled "Building a Community of Life for People and Nature Together", and put forward "six insistences" to explain the core meaning and practical path of the concept of building a community of life for people and nature together, demonstrating to the…

Learn More221
082021.04
SummerSummer

Grand opening of GEP ECOTECH Equipment Construction Project

This morning, the much-anticipated GEP ECOTECH annual output of 400 units (sets) of high-efficiency intelligent environmental protection equipment construction project groundbreaking ceremony was held in the Yuanyang County Industrial Gathering Area. Guo Liming, Deputy Director of the Standing Committee of the Xinxiang Municipal People's Congress, Guo Xinjie, Deputy Secretary of the Party…

Learn More234
312021.03
Bulky waste disposal system went to Qingdao, China to fulfill its mission
SummerSummer

Bulky waste disposal system went to Qingdao, China to fulfill its mission

The waste-free city is guided by the new development concept of innovation, coordination, green, openness, and sharing. It promotes the formation of green development and lifestyle, continues to promote the source reduction and resource utilization of solid waste, and minimizes the amount of landfills. The urban development model that reduces the environmental impact of waste to the lowest…

Learn More283
252021.03
SummerSummer

GEP production base with an annual output of 400 sets solid waste recycling equipment (Phase I project) will be completed by the end of the year

On the premise of technological innovation and intelligent manufacturing, GEP Ecotech Co.,Ltd’annual focuses on the R&D, production, sales and service ofintelligent, environmentally friendly technologies and solid waste recycling equipment, providing customers with one-stop solid waste pretreatment solutions.

Learn More231
152021.03
SummerSummer

Intelligent bulky waste shredder and disposal system in Fujian, China officially put into production

Since the implementation of waste classification, various cities in Fujian, China have gradually established an intelligent disposal system from front-end collection to terminal, effectively realizing the reduction, harmlessness, and resource disposal of bulky waste. Bulky waste disposal has a "good place", turning waste into treasure.

Learn More247
242021.02
SummerSummer

Bulky waste disposal equipment is shipped in a centralized manner!

Recently, two sets of bulky waste disposal equipment have been inspected and loaded into trucks at the GEP factory, and they have successively rushed to the Jiangxi project site, which will soon become a solid force for the recycling of local bulky waste.

Learn More212
192021.01
SummerSummer

Hazardous waste pre-disposal system are delivered to the oil field in Northwest China

Here is the national important petroleum and petrochemical base, but also GEP hazardous waste disposal project site. The weather here is difference between winter and summer, dry and few rain, it is always windy in spring and autumn, the temperature difference is big in winter and summer, most place is gobi desert. Oil exploitation is one of the most scenic spots in the desert.

Learn More222
192021.01
SummerSummer

Bulky waste disposal project in Huai’an passed the formal acceptance at one time

Recently, GEP ECOTECH provided a bulky waste disposal system for Huai'an large garbage disposal project. In the operation test, the parameters exceeded expectations and passed the acceptance at one time.

Learn More213
Live ChatWhatsappMessage